HARINDO WAHANA

PROJECT HIGHLIGHTS

JOINT OPERATION AGREEMENT

PT Borneo Indocoal Perkasa (BIC) was signing the joint operation agreement number 045/HW-BIP/II/2018 with PT Harindo Wahana on February 15th, 2018.

Based on this agreement BIC has the legal right to do mining operation, transportation and coal selling for the coal produced from IUP-OP PT Harindo Wahana SK Bupati Kutai Barat Nomor 545/K.875.a/2010.

Project

PREPARATION WORK

On early of March 2018, BICP had to mobilize the heavy equipment using LCT to the IUP OP PT Harindo Wahana’s site which is located at Tering District, Kutai Barat Regency, East Kalimantan Province.

Followed with land-clearing work and developing mine infrastructures.

Project

EQUIPMENTS

Heavy equipment available at the site:

1 unit   Excavator 40T
2 units   ADT 35T
2 units   Excavator 30T
2 units   ADT 40T
4 units   Excavator 20T
14 units   DT 20T
1 unit   Motor Grader
1 unit   Fuel Truck 5k
1 unit   Wheel Loader
4 units   Lighting Tower

Project

EXPLORATION

Exploration activities are carried out by drilling using a jacro – 175 drilling machine. The average drilling depth is up to 50 meters.

Up to now 45 holes has beed drilled with a total depths of ± 2.250 meter.

Project
Project

MINE DESIGN & PLANNING

From the results of the exploration that has been carried out, it is set to do mining in two blocks :

– East Block  ± 15 Ha

– West Block  ± 35 Ha

Measured reserves of the two blocks are ± 3,000,000 MT which are targeted to be mined within 3 years.

Project

MINING ACTIVITY

Mining activities are carried out with strict supervision by placing work safety as a top priority.

The quality and professionalism of selected human resources is expected to be a strong foundation to achieve the target of quantity and quality that has been set to meet customer needs and satisfaction.

Project
Project

MINING ACTIVITY

Mining activities are carried out with strict supervision by placing work safety as a top priority.

The quality and professionalism of selected human resources is expected to be a strong foundation to achieve the target of quantity and quality that has been set to meet customer needs and satisfaction.

Project
Project

AERIAL VIEW – HW PROJECT

LEGENDA:
1– Existing Pit
2– Base camp
3– Parking Area
4– Disposal
5– Settling Pond

Project

CRUSHER

Crushing plant is located inside stockpile area. The capacity of the crushing rate is up to 250 MT per hour. Total stockpile area is  ± 12 Ha (raw & crushed stock).

Project

COAL HAULING

The coal from the pit is hauled to the stockpile which is 9 KMs away using 20 tons dump trucks. The average width of the hauling road is approx. 12 Ms.

Project

SHIPPING

The coal from the stockpile is hauled to the jetty which is 1 KM away using 20 tons dump trucks and poured directly into the conveyor hopper.

The shipping process uses Barge Loading Conveyor (BLC) which has a loading rate of up to 500 MTs per hour.

The jetty capacity is maximum for 270 ft barge size ( ± 5,300 MTs)

Project

PROJECT’s SUMMARY

Project

SERTIFIKAT ANALISA

Project

PROJECT’s PERMITS

Project
Project